[as of 2026-11-24] CED Ducor 4 has the identifier eia_plant_id 60081. (current, 0.95, registry) [as of 2026-11-24] CED Ducor 4 is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] CED Ducor 4 is an instance of solar power station. (current, 0.95, registry) [2025] CED Ducor 4 is owned by RWE Clean Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] CED Ducor 4 is operated by RWE Clean Energy. (current, 0.95, registry) [2025] CED Ducor 4 had a generating capacity of 20.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] CED Ducor 4 is located in Tulare County, California. (current, 0.95, registry) [as of 2026-11-24] CED Ducor 4 is at 35.850403, -119.026992. (current, 0.95, registry)