[as of 2026-11-24] CED Ducor 2 has the identifier eia_plant_id 60079. [as of 2026-11-24] CED Ducor 2 is an instance of power station. [as of 2026-11-24] CED Ducor 2 is an instance of solar power station. [2025] CED Ducor 2 is owned by RWE Clean Energy from 2025. [as of 2026-11-24] CED Ducor 2 is operated by RWE Clean Energy. [2025] CED Ducor 2 had a generating capacity of 20.0 MW on 2025. [as of 2026-11-24] CED Ducor 2 is located in Tulare County, California. [as of 2026-11-24] CED Ducor 2 is at 35.844167, -119.068069.