[as of 2026-11-24] Castle Gap Wind has the identifier eia_plant_id 65790. [as of 2026-11-24] Castle Gap Wind is an instance of power station. [as of 2026-11-24] Castle Gap Wind is an instance of wind farm. [2025] Castle Gap Wind is owned by Castle Gap Wind Power, LLC from 2025. [as of 2026-11-24] Castle Gap Wind is operated by Castle Gap Wind Power, LLC. [2025] Castle Gap Wind had a generating capacity of 196.8 MW on 2025. [as of 2026-11-24] Castle Gap Wind is located in Mills County, Texas. [as of 2026-11-24] Castle Gap Wind is at 31.39376, -98.35936.