# Castle Gap Solar Hybrid

place · `castle-gap-solar-hybrid` · tier 1 · v1 · updated 2026-11-24

190 MW solar power station in Upton County, Texas, operated by Upton County Solar 2 LLC

## Identifiers
- eia_plant_id: 60123

## Facts
### Current
- Castle Gap Solar Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_843b9110a02c22bff70ecbe776a0d9ca@1>
- Castle Gap Solar Hybrid is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_a62836c52120c6e8a83556d15689f915@1>
- Castle Gap Solar Hybrid is owned by Upton County Solar 2 LLC from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_968aaec229795919d5f21e20f7b8dded@1>
- Castle Gap Solar Hybrid is operated by Upton County Solar 2 LLC. (current, 0.95, registry) <https://entiti.tech/c/k_98e37e27cece0fee1c8c596e6364be8d@1>
- Castle Gap Solar Hybrid had a generating capacity of 189.9 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_cc55dadee8a76a81cf7977ef7c1c3293@1>
- Castle Gap Solar Hybrid is located in Upton County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_7efa075a4934c1d94561386321e93bc4@1>
- Castle Gap Solar Hybrid is at 31.255, -102.272. (current, 0.95, registry) <https://entiti.tech/c/k_f2d7aab17efd0f825de3ca849c22137f@1>

## Links
- JSON: /e/castle-gap-solar-hybrid.json · JSON-LD: /e/castle-gap-solar-hybrid.jsonld · Facts: /e/castle-gap-solar-hybrid.txt · Feed: /e/castle-gap-solar-hybrid/feed.xml · Graph: /e/castle-gap-solar-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>