# Camino Solar Hybrid

place · `camino-solar-hybrid` · tier 1 · v1 · updated 2026-11-24

44 MW solar power station in Kern County, California, operated by Avangrid Power LLC

## Identifiers
- eia_plant_id: 63508

## Facts
### Current
- Camino Solar Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_67f4b26756d336db34868a31bd15157c@1>
- Camino Solar Hybrid is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_d19bc1e5d4708cf0371dc5b0902beeac@1>
- Camino Solar Hybrid is owned by Avangrid Power LLC from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_55e29e98d43dd14300ac45b515163665@1>
- Camino Solar Hybrid is operated by Avangrid Power LLC. (current, 0.95, registry) <https://entiti.tech/c/k_09d2947fcdc8224bb8711efca9f0e27a@1>
- Camino Solar Hybrid had a generating capacity of 44.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_3b5efa579fcd0cb7b73e52ecd362957e@1>
- Camino Solar Hybrid is located in Kern County, California. (current, 0.95, registry) <https://entiti.tech/c/k_5a851317de89b359cfd1043b54402a10@1>
- Camino Solar Hybrid is at 34.93031, -118.443211. (current, 0.95, registry) <https://entiti.tech/c/k_a23b8e7f8499312a4b7eb440d880cc80@1>

## Links
- JSON: /e/camino-solar-hybrid.json · JSON-LD: /e/camino-solar-hybrid.jsonld · Facts: /e/camino-solar-hybrid.txt · Feed: /e/camino-solar-hybrid/feed.xml · Graph: /e/camino-solar-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
