[as of 2026-11-24] Camino (hydroelectric power station) has the identifier eia_plant_id 430. (current, 0.95, registry) [as of 2026-11-24] Camino (hydroelectric power station) is an instance of hydroelectric power station. (current, 0.95, registry) [as of 2026-11-24] Camino (hydroelectric power station) is an instance of power station. (current, 0.95, registry) [2025] Camino (hydroelectric power station) is owned by Sacramento Municipal Util Dist from 2025. (current, 0.95, registry) [as of 2026-11-24] Camino (hydroelectric power station) is operated by Sacramento Municipal Util Dist. (current, 0.95, registry) [2025] Camino (hydroelectric power station) had a generating capacity of 157.8 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Camino (hydroelectric power station) is located in El Dorado County, California. (current, 0.95, registry) [as of 2026-11-24] Camino (hydroelectric power station) is at 38.82881, -120.537089. (current, 0.95, registry)