[as of 2026-11-24] Buffalo Gap Wind Farm has the identifier eia_plant_id 56240. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap Wind Farm is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap Wind Farm is an instance of wind farm. (current, 0.95, registry) [2025] Buffalo Gap Wind Farm is owned by AES Distributed Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap Wind Farm is operated by AES Distributed Energy. (current, 0.95, registry) [2025] Buffalo Gap Wind Farm had a generating capacity of 120.6 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap Wind Farm is located in Taylor County, Texas. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap Wind Farm is at 32.311556, -100.061589. (current, 0.95, registry)