[as of 2026-11-24] Buffalo Gap 3 Wind Farm has the identifier eia_plant_id 56638. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 3 Wind Farm is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 3 Wind Farm is an instance of wind farm. (current, 0.95, registry) [2025] Buffalo Gap 3 Wind Farm is owned by AES Distributed Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 3 Wind Farm is operated by AES Distributed Energy. (current, 0.95, registry) [2025] Buffalo Gap 3 Wind Farm had a generating capacity of 170.2 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 3 Wind Farm is located in Nolan County, Texas. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 3 Wind Farm is at 32.2878, -100.1. (current, 0.95, registry)