# Buffalo Gap 3 Wind Farm

place · `buffalo-gap-3-wind-farm` · tier 1 · v1 · updated 2026-11-24

170 MW wind farm in Nolan County, Texas, operated by AES Distributed Energy

## Identifiers
- eia_plant_id: 56638

## Facts
### Current
- Buffalo Gap 3 Wind Farm is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_7a6c8583056b74a7c5961c81134ef77c@1>
- Buffalo Gap 3 Wind Farm is an instance of wind farm. (current, 0.95, registry) <https://entiti.tech/c/k_e066df46a2aefb641e7a47d9e3d78375@1>
- Buffalo Gap 3 Wind Farm is owned by AES Distributed Energy from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_e516b258845e2cee7a71cc0edbe5f942@1>
- Buffalo Gap 3 Wind Farm is operated by AES Distributed Energy. (current, 0.95, registry) <https://entiti.tech/c/k_2079ace82508bba9b6e2bca273a964fa@1>
- Buffalo Gap 3 Wind Farm had a generating capacity of 170.2 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_640d9f059a706ed673b08022b966d63f@1>
- Buffalo Gap 3 Wind Farm is located in Nolan County, Texas. (current, 0.95, registry) <https://entiti.tech/c/k_077de47e0ed9601b759dca7f193145ea@1>
- Buffalo Gap 3 Wind Farm is at 32.2878, -100.1. (current, 0.95, registry) <https://entiti.tech/c/k_e5f674bab83411757d263e52b843249a@1>

## Links
- JSON: /e/buffalo-gap-3-wind-farm.json · JSON-LD: /e/buffalo-gap-3-wind-farm.jsonld · Facts: /e/buffalo-gap-3-wind-farm.txt · Feed: /e/buffalo-gap-3-wind-farm/feed.xml · Graph: /e/buffalo-gap-3-wind-farm/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
