[as of 2026-11-24] Buffalo Gap 2 Wind Farm has the identifier eia_plant_id 56484. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 2 Wind Farm is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 2 Wind Farm is an instance of wind farm. (current, 0.95, registry) [2025] Buffalo Gap 2 Wind Farm is owned by AES Distributed Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 2 Wind Farm is operated by AES Distributed Energy. (current, 0.95, registry) [2025] Buffalo Gap 2 Wind Farm had a generating capacity of 232.5 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 2 Wind Farm is located in Nolan County, Texas. (current, 0.95, registry) [as of 2026-11-24] Buffalo Gap 2 Wind Farm is at 32.318221, -100.176986. (current, 0.95, registry)