[as of 2026-11-24] Bent Tree Wind Farm Phase 1 has the identifier eia_plant_id 57198. (current, 0.95, registry) [as of 2026-11-24] Bent Tree Wind Farm Phase 1 is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Bent Tree Wind Farm Phase 1 is an instance of wind farm. (current, 0.95, registry) [2025] Bent Tree Wind Farm Phase 1 is owned by Wisconsin Power & Light Co from 2025. (current, 0.95, registry) [as of 2026-11-24] Bent Tree Wind Farm Phase 1 is operated by Wisconsin Power & Light Co. (current, 0.95, registry) [2025] Bent Tree Wind Farm Phase 1 had a generating capacity of 201.3 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Bent Tree Wind Farm Phase 1 is located in Freeborn County, Minnesota. (current, 0.95, registry) [as of 2026-11-24] Bent Tree Wind Farm Phase 1 is at 43.724596, -93.450429. (current, 0.95, registry)