{
  "root": "barry",
  "as_of": null,
  "as_of_mode": "definite",
  "depth": 2,
  "token_estimator": "bytes4",
  "bounds": {
    "max_tokens": 4000,
    "max_nodes": 200,
    "max_edges": 2000,
    "max_reads": 400,
    "max_ms": 2000
  },
  "snapshot": [
    {
      "id": "barry",
      "version": 1
    },
    {
      "id": "mobile-county-alabama",
      "version": 7
    },
    {
      "id": "alabama-power-co",
      "version": 1
    },
    {
      "id": "natural-gas-combined-cycle-power-station",
      "version": 2
    }
  ],
  "nodes": [
    {
      "id": "barry",
      "label": "Barry",
      "type": "place",
      "tier": 1,
      "hop": 0
    },
    {
      "id": "mobile-county-alabama",
      "label": "Mobile County, Alabama",
      "type": "place",
      "tier": 1,
      "hop": 1
    },
    {
      "id": "alabama-power-co",
      "label": "Alabama Power Co",
      "type": "organization",
      "tier": 0,
      "hop": 1
    },
    {
      "id": "natural-gas-combined-cycle-power-station",
      "label": "natural gas combined-cycle power station",
      "type": "concept",
      "tier": 0,
      "hop": 1
    }
  ],
  "edges": [
    {
      "claim": "k_96140c4b5d3f76a73b8d4d10183f8427",
      "revision": 1,
      "from": "barry",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_ddaf4bc53a420a2ad09847c5a403d1ea",
      "revision": 1,
      "from": "barry",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_9b24904968c85518e73911fbfd8dce34",
      "revision": 1,
      "from": "barry",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_044d4420aa03e0a3075a8d3dea0d1fe0",
      "revision": 1,
      "from": "barry",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_7c63fc04ea47aa4070da063b3e85fcfc",
      "revision": 1,
      "from": "barry",
      "to": "power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_253ce7022d0e9746d53825db43a21794",
      "revision": 1,
      "from": "mobile-county-alabama",
      "to": "alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_d44ac78007891ec1d23f8d75530e7614",
      "revision": 1,
      "from": "mobile-county-alabama",
      "to": "domain:mobilecountyal.gov",
      "predicate": "website"
    },
    {
      "claim": "k_efbb8f3ce20ac6c5c6dbfb03f4381d20",
      "revision": 1,
      "from": "amrize-theodore-plant",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_f8784c6ac18f984c477df548b6bccbcb",
      "revision": 1,
      "from": "axis-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_a202cbfd2378a8bdd496fd37a348e860",
      "revision": 1,
      "from": "belle-fontaine-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_23f2ecd679d4da29b6cabf1864deb34e",
      "revision": 1,
      "from": "bucks-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_2bd267efa887003ec190956bf8c0cf8f",
      "revision": 1,
      "from": "chunchula-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_8926c618852b03057615abd029b99cf7",
      "revision": 1,
      "from": "grand-bay-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_ce820fa788aa0f94a755330a5f36bc16",
      "revision": 1,
      "from": "gulfcrest-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_0a5d5ec27a2e2b54a71677f651605399",
      "revision": 1,
      "from": "hog-bayou-energy-center",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_7d427f9dd621123855ab5f1a96a95fec",
      "revision": 1,
      "from": "lynn-nolen-construction-mobile-county-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_58540f2ca37c2ac46c273c3c2411e6a5",
      "revision": 1,
      "from": "mlc-mobile",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_ba8798b2d961d40589cdae7aa72b9266",
      "revision": 1,
      "from": "movico-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_8d784bb53bd30675889fb6547e8603ac",
      "revision": 1,
      "from": "ps-dirt-pit-1",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_ad18eee8f728879cf29431165a5ac569",
      "revision": 1,
      "from": "smith-sand-company-inc",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_a582822c3b9c63fb005c266f150347ca",
      "revision": 1,
      "from": "theodore-cogen-facility",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_dfd3511dfb04a5c71057dd889262972e",
      "revision": 1,
      "from": "theodore-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_6dcfcfeb26ce18ac7fc63517cfc8d56a",
      "revision": 1,
      "from": "tillmans-corner-alabama",
      "to": "mobile-county-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_5701b6a098257433bd2dcf8f77828fa0",
      "revision": 1,
      "from": "alabama-power-co",
      "to": "birmingham-alabama",
      "predicate": "located_in"
    },
    {
      "claim": "k_11c35781f7414edb55f6b917146066d2",
      "revision": 1,
      "from": "alabama-power-co",
      "to": "investor-owned-utility",
      "predicate": "instance_of"
    },
    {
      "claim": "k_dfda419dab5dfa8aae77be1503c76e43",
      "revision": 1,
      "from": "bankhead-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_57709289399f3edd91f3cdc0a4604b8c",
      "revision": 1,
      "from": "central-alabama-generating-station",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_389902cb9770f577e11bcce22add07b6",
      "revision": 1,
      "from": "e-c-gaston",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_9fabab349e729a3eb40f7707867f5c98",
      "revision": 1,
      "from": "fort-rucker-solar-array",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_060712276e474c09fcaafb89a1b53799",
      "revision": 1,
      "from": "general-electric-plastic",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_46bc680553b3bab6d6704b29f276e497",
      "revision": 1,
      "from": "greene-county",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_915ad76f619f16872ebf702a853cad69",
      "revision": 1,
      "from": "h-neely-henry-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_1db94c9016db67055aa64b57a95ae693",
      "revision": 1,
      "from": "harris-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_755c99bb298d8ff4a50478dded7afea0",
      "revision": 1,
      "from": "holt-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_74ac77910fe28c45fe18667f790e923c",
      "revision": 1,
      "from": "james-h-miller-jr",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_263c4387bf1cdd2d460956781c1c42be",
      "revision": 1,
      "from": "jordan-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_bc9a4dd681ebc530a4f462961659233e",
      "revision": 1,
      "from": "joseph-m-farley",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_2c88b4033be3b8a0181448102c3fe13b",
      "revision": 1,
      "from": "lay-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_1594966a364e534316f7fd34bdd53eaa",
      "revision": 1,
      "from": "lewis-smith-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_296cb4a9d21242cb076d3606c6872edd",
      "revision": 1,
      "from": "logan-martin-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_ac3c043af56e7cd5bbb55f8e8685daf8",
      "revision": 1,
      "from": "martin-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_2047aa43c46fd6f942de812e8ae95271",
      "revision": 1,
      "from": "mitchell-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_6feeb35fa28a236757f3d9429cdf6c33",
      "revision": 1,
      "from": "tenaska-lindsay-hill-generating-station",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_2d0638b9e266a0b983913c8c72dfe1b0",
      "revision": 1,
      "from": "theodore-cogen-facility",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_14a5a75e14bf1407366879d057bac074",
      "revision": 1,
      "from": "thurlow-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_58b94e281de17ebf6b302a476b8101d2",
      "revision": 1,
      "from": "walter-bouldin-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_741841eca53f0bb00243b926268362e9",
      "revision": 1,
      "from": "washington-county-cogeneration-facility",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_c56e9bcc9a5251925f2f7f6bd132160b",
      "revision": 1,
      "from": "weiss-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_4c31931c31173cd76fea8f78d50eafa5",
      "revision": 1,
      "from": "yates-dam",
      "to": "alabama-power-co",
      "predicate": "owned_by"
    },
    {
      "claim": "k_f1eb08972e0ee7ad85ff946af625c8f0",
      "revision": 1,
      "from": "bankhead-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_d120e2ac49c9b0c998f129400dbe434d",
      "revision": 1,
      "from": "calhoun-energy-center",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_dade89ab96ef92d704d54142aee2e9df",
      "revision": 1,
      "from": "central-alabama-generating-station",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_af602964d48a22a0a645bc1c79cae219",
      "revision": 1,
      "from": "e-c-gaston",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_07e2bcfcd6a7d0ab629badcf7529fdcc",
      "revision": 1,
      "from": "fort-rucker-solar-array",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_5548b9ac4eed41f8d0550ab78af212e4",
      "revision": 1,
      "from": "general-electric-plastic",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_dc20e9eb3a1c08814dc9e2d41c8196ab",
      "revision": 1,
      "from": "greene-county",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_b95d3db1d0d5adddbe5e95f9da10ec4b",
      "revision": 1,
      "from": "h-neely-henry-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_ce300587844f141406cca4fbf9d341f0",
      "revision": 1,
      "from": "harris-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_3a08ffae15767e81c8ca2e9314c07fe1",
      "revision": 1,
      "from": "holt-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_36add79f3c0a20cab4e03de6ba1a4688",
      "revision": 1,
      "from": "james-h-miller-jr",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_85739e2954f5e3a60e33e15892d8024e",
      "revision": 1,
      "from": "jordan-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_cc01d613581212ca7a821413fc28e041",
      "revision": 1,
      "from": "joseph-m-farley",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_c6bb92963c1d8506a22c7b54749314a2",
      "revision": 1,
      "from": "lay-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_be7bf342e7a85d67c3890c63826753d0",
      "revision": 1,
      "from": "lewis-smith-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_8437956bb3f3e99137dea965ff83a465",
      "revision": 1,
      "from": "logan-martin-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_8c275907687f04cd105fe34241623857",
      "revision": 1,
      "from": "martin-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_35ab298f2074069854f1ab06cf0e69fe",
      "revision": 1,
      "from": "mitchell-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_7018f66518d4efd9836da46239e4ea8b",
      "revision": 1,
      "from": "tenaska-lindsay-hill-generating-station",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_7421ebbac357cb4d3a93015df22434bc",
      "revision": 1,
      "from": "theodore-cogen-facility",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_43f9b5e7e89232af2bef7f7636a0db59",
      "revision": 1,
      "from": "thurlow-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_1b4e44018c0873ac453d9b31985d8c67",
      "revision": 1,
      "from": "walter-bouldin-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_cebdc3c473d24428717e253b425daacd",
      "revision": 1,
      "from": "washington-county-cogeneration-facility",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_a71cfe5d20af26f7853b17e545303de0",
      "revision": 1,
      "from": "weiss-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_ca6766b4789469895d1e626fd99991ed",
      "revision": 1,
      "from": "yates-dam",
      "to": "alabama-power-co",
      "predicate": "operator"
    },
    {
      "claim": "k_7e067ca83509453c0a425e3ac84e6849",
      "revision": 1,
      "from": "acadia-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_f0a7d723eaf0d898d98a2996262801e1",
      "revision": 1,
      "from": "afton-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_44f80f4742d18abdd9f33a419ff0a717",
      "revision": 1,
      "from": "agnews-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_6fc230bc885e5cf8a35dd45acef53544",
      "revision": 1,
      "from": "algonquin-windsor-locks",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_ea99bfd49de3962ef2bc6eec5d9be132",
      "revision": 1,
      "from": "allegheny-energy-units-3-4-5",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_6e1787ace0dc71aee6c903590c0dd0f9",
      "revision": 1,
      "from": "allen",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_e13a4f27f17c1c85610b86cc3c441f13",
      "revision": 1,
      "from": "anadarko-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_fc6444ea906784c33891d6c816f746ec",
      "revision": 1,
      "from": "arthur-von-rosenberg",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4c7ec5e9e3080c6e9fb938beda554410",
      "revision": 1,
      "from": "arvah-b-hopkins",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_b8dec6ba14333fead140e805bb7ce55f",
      "revision": 1,
      "from": "asheville-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_0e38b9266e07802faaea533e18c41fa8",
      "revision": 1,
      "from": "astoria-energy",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_edc937c2e46db346658a08e679ce4def",
      "revision": 1,
      "from": "athens-generating-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_33f4d700752bd6b6ab6ff8756e11f8ad",
      "revision": 1,
      "from": "attala",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_7d8fc808de30c1e384f0e1ece6bab82a",
      "revision": 1,
      "from": "barney-m-davis",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_bd9cce233fa20d7680b5bd33a04a66be",
      "revision": 1,
      "from": "batavia-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_1ce2077aa29dac758a26c128c011395a",
      "revision": 1,
      "from": "batesville-generation-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_f6a9c17fede730e3bbb4ad2026e71c4d",
      "revision": 1,
      "from": "baytown-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_bdeb3511fd4ff30d010d0f2d4dbaf2fa",
      "revision": 1,
      "from": "bear-garden",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_2db403d1dd58cf73286d16f06e54887a",
      "revision": 1,
      "from": "beatrice-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_9e4313e2606e3bfebbf2008ee9ab682f",
      "revision": 1,
      "from": "beaver-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_c8e2af401df11387a80d684322d28ef2",
      "revision": 1,
      "from": "bellingham-cogeneration-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_3ca6f53e5f63a50f60c1cc66d19f67de",
      "revision": 1,
      "from": "bergen-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_91b39a0ffda372db9b5cc5ac64819a95",
      "revision": 1,
      "from": "berkshire-power",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_20f6d558b5c9b77c8dd066213268a9bd",
      "revision": 1,
      "from": "bethpage-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_5d8ee2d84452b94fce66774f30409999",
      "revision": 1,
      "from": "big-bend",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_35a06ebb913a013254f4eac46aada484",
      "revision": 1,
      "from": "black-dog",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_132bf703a0aa7a436daed4edef1ab1e3",
      "revision": 1,
      "from": "blue-water-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_8623390359f940b092db4eecbecf8808",
      "revision": 1,
      "from": "bluffview",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_8652ea55dcab1bd85d4a223b4bd009fa",
      "revision": 1,
      "from": "bobby-c-smith-jr-energy-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_0e7084eba39efa9d773cf5fd0ae683e4",
      "revision": 1,
      "from": "brandy-branch",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_f85a6956de7ee1398c4c23ce5e03f6a4",
      "revision": 1,
      "from": "brandywine-power-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4ea93e1494fe06fe7612fc747e303dd9",
      "revision": 1,
      "from": "bridgeport-energy-project",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4127bae60fdc389ba2448d2889e9a20e",
      "revision": 1,
      "from": "bridgeport-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_471252d601bddd43c7ff77dce92b89e8",
      "revision": 1,
      "from": "brooklyn-navy-yard-cogeneration",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_d184f80b7300a073809e45d42fec9b22",
      "revision": 1,
      "from": "brunswick-county-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_eb5b1002bb6b4b337e6e95fb003ab376",
      "revision": 1,
      "from": "buck",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4e909309949ad1a1b94634f6fd6d9ef6",
      "revision": 1,
      "from": "c-d-mcintosh-jr",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_cd1372bf1cdff81b24a7a472b4090837",
      "revision": 1,
      "from": "caledonia-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_9e8204e93768bb951225a16397f0a043",
      "revision": 1,
      "from": "california-institute-of-technology-los-angeles-county-california",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_92813b6f2898e646f5982b47e92e367a",
      "revision": 1,
      "from": "camchino-leasing-llc-san-bernardino-county-california",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_6c7c8df7e9e5fac1f88f05be0f6bec38",
      "revision": 1,
      "from": "campbell-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_cbdd793a7cd54351eb45e759fc1efe9d",
      "revision": 1,
      "from": "cane-island",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_ae610acab08536881ca62c2af869adc6",
      "revision": 1,
      "from": "cane-run",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_05c4482c5bd8b41621f7d38232e6b746",
      "revision": 1,
      "from": "cape-canaveral-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4d9f859734078f5fe1986f71f9871ee8",
      "revision": 1,
      "from": "carr-street-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_1713bb2fc7cf8686f22294cddfeaf3a6",
      "revision": 1,
      "from": "carson-cogeneration",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_a45d35cd64982981ebed87f8561ee64e",
      "revision": 1,
      "from": "carson-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_fc9e9a9607642f79f96a38f741466207",
      "revision": 1,
      "from": "carthage-energy-llc-jefferson-county-new-york",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4bf651f0a6f8e5179ff410e5c0132d0a",
      "revision": 1,
      "from": "carty-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_348cfa33fb434f472f745c9483f735ae",
      "revision": 1,
      "from": "carville-energy-llc-iberville-parish-louisiana",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_dc770aedfecb28bd34138c1fc72efaeb",
      "revision": 1,
      "from": "central-alabama-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_585c4d71f02a26126c0013917231ef95",
      "revision": 1,
      "from": "ces-placerita-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_5533a2418be6afc79008c43f369421d7",
      "revision": 1,
      "from": "channel-energy-center-llc-harris-county-texas",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_412a25f7752088e897f95afaaa75e8a9",
      "revision": 1,
      "from": "chattahoochee-energy-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_82678566247dacaa76fb8f698e0d9e66",
      "revision": 1,
      "from": "chehalis-generating-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_70515e61a343d7a57606ff46aaefade6",
      "revision": 1,
      "from": "cherokee",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_1824a605b7921c5416c662b3ef8f7e9f",
      "revision": 1,
      "from": "chester-operations",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_e474e361b4181a1fd806f6a0c3dca176",
      "revision": 1,
      "from": "chesterfield",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_acea5f6de15ee0cba9eac27cfb5ef1b6",
      "revision": 1,
      "from": "cheyenne-prairie-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_140e7f9cafd734df5c1dff48c2edab53",
      "revision": 1,
      "from": "chino-mines",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_0fbdea2dcd6b296f58021a26356364cb",
      "revision": 1,
      "from": "choctaw-county",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_f48599c27bb7f2d552b5a8962903a9b6",
      "revision": 1,
      "from": "chouteau-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_2ca112fc23131fdc254e74ea5a81b337",
      "revision": 1,
      "from": "chuck-lenzie-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_2cdf24139389b089bf816eda243421d0",
      "revision": 1,
      "from": "clearwater-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_1498bf21d2954fb10ad69d93d91f3fc2",
      "revision": 1,
      "from": "cleary-flood-hybrid",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_c8441dcc8af9744aad1ccc1cc6afa185",
      "revision": 1,
      "from": "colorado-bend-ii",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4714eebfac803c0b7111e9ea131d8474",
      "revision": 1,
      "from": "columbia-energy-center-sc",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_f877ad3a6b1215452767824a4ccef45c",
      "revision": 1,
      "from": "colusa-generating-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_cbef3204b11180e0ac20a850d61ffbcc",
      "revision": 1,
      "from": "comanche-ok",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_9d0ec51c15edd0dd7b7901639619e2cf",
      "revision": 1,
      "from": "cordova-energy",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_aa9023902fa48cef17766faa6f5b95d2",
      "revision": 1,
      "from": "cornell-university-central-heat",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_eb2751666d61951a31d46c9a0bdd2730",
      "revision": 1,
      "from": "corpus-christi-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_73a0296858c6c5da9a5e692d96695924",
      "revision": 1,
      "from": "cosumnes-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_3d3266df0c9e945fa955e0301afa6169",
      "revision": 1,
      "from": "coughlin-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_96db3348e96635667e7c5b6042fdd741",
      "revision": 1,
      "from": "coyote-springs",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_b40fde544aede2fb90b11db4b195881d",
      "revision": 1,
      "from": "coyote-springs-ii",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_7631388aaf26e29c24c8c2ad020d997b",
      "revision": 1,
      "from": "cpv-towantic-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_8ac6056dc32cd8147f50764f32cee066",
      "revision": 1,
      "from": "crystal-river-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_cc5d1d585a201a829fc2fcb095d0872a",
      "revision": 1,
      "from": "currant-creek",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_57419c507babd3e29177809f467392a0",
      "revision": 1,
      "from": "dan-river",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_9f59c1be171bac504ec39c314520efa7",
      "revision": 1,
      "from": "dania-beach-7",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_a6fb0527f2f1a2323d3bbe130b2f1746",
      "revision": 1,
      "from": "dearborn-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_cacdc7c6d389ab06f4a1ff21d53890c9",
      "revision": 1,
      "from": "decatur-energy-center",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_0f9a907129b2360ce8a6ab0a242d4aaf",
      "revision": 1,
      "from": "deer-creek-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_d0a031eb1c5bdff4e5c0e4691ffc6c78",
      "revision": 1,
      "from": "dell-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_6702511a8a8a6fbce4039b09cf5fb747",
      "revision": 1,
      "from": "delta-energy-park",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_87d6e8c64ab0cac79dbe318371a3e296",
      "revision": 1,
      "from": "desert-basin",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_aec9d8cbda0ea70f8eff9cf3538d1a98",
      "revision": 1,
      "from": "donald-von-raesfeld-power-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_a0ee3d53baf6bbc447388cfa2b8134fe",
      "revision": 1,
      "from": "dresden-energy-facility",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_d965feb81ad2445e61c56865d36e9ef0",
      "revision": 1,
      "from": "e-b-harris-electric-generating-plant",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_92266949265158fea9cce47bcdd1fdbc",
      "revision": 1,
      "from": "eagle-valley-in",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_0ac0356248257f2ecea6c0648ce82ac8",
      "revision": 1,
      "from": "edwardsport-natural-gas-combined-cycle-power-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_c790f8582e112d08532385b6f34bfeb8",
      "revision": 1,
      "from": "el-centro-hybrid",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_5bffa6244e810885b5a6d0d60da2054b",
      "revision": 1,
      "from": "el-segundo-cogen",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_006a0160c65ee0072578fcf1d2d01600",
      "revision": 1,
      "from": "elk-hills-power-llc-kern-county-california",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_f7f92fb034310d6cadfb8968e1602311",
      "revision": 1,
      "from": "emery-station",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_b3e63aa69d9a661c09b2d9e1859767ea",
      "revision": 1,
      "from": "encogen",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_38398d321185aeb8cfefccc9b5b0e633",
      "revision": 1,
      "from": "energy-center-dover",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    },
    {
      "claim": "k_4ab42867152ab58d685f94a6e3c96463",
      "revision": 1,
      "from": "faribault-energy-park",
      "to": "natural-gas-combined-cycle-power-station",
      "predicate": "instance_of"
    }
  ],
  "facts": [
    "[as of 2026-11-24] Barry is located in Mobile County, Alabama.",
    "[as of 2026-11-24] Barry is at 31.0069, -88.0103.",
    "[as of 2026-11-24] Barry has the identifier eia_plant_id 3.",
    "[2025] Barry is owned by Alabama Power Co from 2025.",
    "[as of 2026-11-24] Barry is operated by Alabama Power Co.",
    "[2025] Barry had a generating capacity of 3343.5 MW on 2025.",
    "[as of 2026-11-24] Barry is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Barry is an instance of power station.",
    "[as of 2026-10-31] Mobile County, Alabama is located in Alabama.",
    "[as of 2026-10-31] Mobile County, Alabama is at 30.786389, -88.213889.",
    "[2025-07-01] Mobile County, Alabama had a population of 411658 on 2025-07-01.",
    "[as of 2026-11-20] Mobile County, Alabama's website is mobilecountyal.gov.",
    "[as of 2026-10-31] Mobile County, Alabama has the identifier wikidata Q495738.",
    "[as of 2026-10-31] Mobile County, Alabama has the identifier us_census_geoid 01097.",
    "[as of 2026-11-23] Mobile County, Alabama contains Amrize Theodore Plant.",
    "[as of 2026-11-17] Mobile County, Alabama contains Axis, Alabama.",
    "[as of 2026-11-24] Mobile County, Alabama contains Barry.",
    "[as of 2026-11-17] Mobile County, Alabama contains Belle Fontaine, Alabama.",
    "[as of 2026-11-17] Mobile County, Alabama contains Bucks, Alabama.",
    "[as of 2026-11-17] Mobile County, Alabama contains Chunchula, Alabama.",
    "[as of 2026-11-17] Mobile County, Alabama contains Grand Bay, Alabama.",
    "[as of 2026-11-17] Mobile County, Alabama contains Gulfcrest, Alabama.",
    "[as of 2026-11-24] Mobile County, Alabama contains Hog Bayou Energy Center.",
    "[as of 2026-11-23] Mobile County, Alabama contains Lynn Nolen Construction (Mobile County, Alabama).",
    "[as of 2026-11-23] Mobile County, Alabama contains MLC - Mobile.",
    "[as of 2026-11-17] Mobile County, Alabama contains Movico, Alabama.",
    "[as of 2026-11-23] Mobile County, Alabama contains PS Dirt Pit #1.",
    "[as of 2026-11-23] Mobile County, Alabama contains Smith Sand Company Inc.",
    "[as of 2026-11-24] Mobile County, Alabama contains Theodore Cogen Facility.",
    "[as of 2026-11-17] Mobile County, Alabama contains Theodore, Alabama.",
    "[as of 2026-11-17] Mobile County, Alabama contains Tillmans Corner, Alabama.",
    "[as of 2026-11-24] Alabama Power Co is located in Birmingham, Alabama.",
    "[as of 2026-11-24] Alabama Power Co has the identifier eia_utility_id 195.",
    "[as of 2026-11-24] Alabama Power Co is an instance of investor-owned utility.",
    "[2025] Alabama Power Co owns Bankhead Dam from 2025.",
    "[2025] Alabama Power Co owns Barry from 2025.",
    "[2025] Alabama Power Co owns Central Alabama Generating Station from 2025.",
    "[2025] Alabama Power Co owns E C Gaston (73.4%) from 2025.",
    "[2025] Alabama Power Co owns Fort Rucker Solar Array from 2025.",
    "[2025] Alabama Power Co owns General Electric Plastic from 2025.",
    "[2025] Alabama Power Co owns Greene County (82.4%) from 2025.",
    "[2025] Alabama Power Co owns H Neely Henry Dam from 2025.",
    "[2025] Alabama Power Co owns Harris Dam from 2025.",
    "[2025] Alabama Power Co owns Holt Dam from 2025.",
    "[2025] Alabama Power Co owns James H Miller Jr (95.9%) from 2025.",
    "[2025] Alabama Power Co owns Jordan Dam from 2025.",
    "[2025] Alabama Power Co owns Joseph M Farley from 2025.",
    "[2025] Alabama Power Co owns Lay Dam from 2025.",
    "[2025] Alabama Power Co owns Lewis Smith Dam from 2025.",
    "[2025] Alabama Power Co owns Logan Martin Dam from 2025.",
    "[2025] Alabama Power Co owns Martin Dam from 2025.",
    "[2025] Alabama Power Co owns Mitchell Dam from 2025.",
    "[2025] Alabama Power Co owns Tenaska Lindsay Hill Generating Station from 2025.",
    "[2025] Alabama Power Co owns Theodore Cogen Facility from 2025.",
    "[2025] Alabama Power Co owns Thurlow Dam from 2025.",
    "[2025] Alabama Power Co owns Walter Bouldin Dam from 2025.",
    "[2025] Alabama Power Co owns Washington County Cogeneration Facility from 2025.",
    "[2025] Alabama Power Co owns Weiss Dam from 2025.",
    "[2025] Alabama Power Co owns Yates Dam from 2025.",
    "[as of 2026-11-24] Alabama Power Co operates Bankhead Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Barry.",
    "[as of 2026-11-24] Alabama Power Co operates Calhoun Energy Center.",
    "[as of 2026-11-24] Alabama Power Co operates Central Alabama Generating Station.",
    "[as of 2026-11-24] Alabama Power Co operates E C Gaston.",
    "[as of 2026-11-24] Alabama Power Co operates Fort Rucker Solar Array.",
    "[as of 2026-11-24] Alabama Power Co operates General Electric Plastic.",
    "[as of 2026-11-24] Alabama Power Co operates Greene County.",
    "[as of 2026-11-24] Alabama Power Co operates H Neely Henry Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Harris Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Holt Dam.",
    "[as of 2026-11-24] Alabama Power Co operates James H Miller Jr.",
    "[as of 2026-11-24] Alabama Power Co operates Jordan Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Joseph M Farley.",
    "[as of 2026-11-24] Alabama Power Co operates Lay Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Lewis Smith Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Logan Martin Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Martin Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Mitchell Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Tenaska Lindsay Hill Generating Station.",
    "[as of 2026-11-24] Alabama Power Co operates Theodore Cogen Facility.",
    "[as of 2026-11-24] Alabama Power Co operates Thurlow Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Walter Bouldin Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Washington County Cogeneration Facility.",
    "[as of 2026-11-24] Alabama Power Co operates Weiss Dam.",
    "[as of 2026-11-24] Alabama Power Co operates Yates Dam.",
    "[as of 2026-11-24] Acadia Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Afton Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Agnews Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Algonquin Windsor Locks is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Allegheny Energy Units 3 4 & 5 is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Allen is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Anadarko Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Arthur Von Rosenberg is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Arvah B Hopkins is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Asheville (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Astoria Energy is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Athens Generating Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Attala is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Barney M Davis is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Barry is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Batavia Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Batesville Generation Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Baytown Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bear Garden is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Beatrice (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Beaver (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bellingham Cogeneration Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bergen Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Berkshire Power is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bethpage Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Big Bend is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Black Dog is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Blue Water Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bluffview is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bobby C Smith Jr Energy Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Brandy Branch is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Brandywine Power Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bridgeport Energy Project is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Bridgeport Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Brooklyn Navy Yard Cogeneration is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Brunswick County Power Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Buck is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] C D McIntosh Jr is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Caledonia (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] California Institute of Technology (Los Angeles County, California) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] CamChino Leasing LLC (San Bernardino County, California) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Campbell Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cane Island is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cane Run is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cape Canaveral (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Carr Street Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Carson Cogeneration is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Carson Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Carthage Energy LLC (Jefferson County, New York) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Carty Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Carville Energy LLC (Iberville Parish, Louisiana) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Central Alabama Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] CES Placerita Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Channel Energy Center LLC (Harris County, Texas) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chattahoochee Energy Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chehalis Generating Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cherokee is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chester Operations is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chesterfield is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cheyenne Prairie Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chino Mines is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Choctaw County is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chouteau (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Chuck Lenzie Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Clearwater Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cleary Flood Hybrid is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Colorado Bend II is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Columbia Energy Center (SC) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Colusa Generating Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Comanche (OK) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cordova Energy is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cornell University Central Heat is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Corpus Christi Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Cosumnes Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Coughlin Power Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Coyote Springs is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Coyote Springs II is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] CPV Towantic Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Crystal River (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Currant Creek is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Dan River is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Dania Beach 7 is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Dearborn Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Decatur Energy Center is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Deer Creek Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Dell Power Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Delta Energy Park is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Desert Basin is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Donald Von Raesfeld Power Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Dresden Energy Facility is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] E B Harris Electric Generating Plant is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Eagle Valley (IN) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Edwardsport (natural gas combined-cycle power station) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] El Centro Hybrid is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] El Segundo Cogen is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Elk Hills Power LLC (Kern County, California) is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Emery Station is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Encogen is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Energy Center Dover is an instance of natural gas combined-cycle power station.",
    "[as of 2026-11-24] Faribault Energy Park is an instance of natural gas combined-cycle power station."
  ],
  "predicates_covered": [
    "located_in",
    "coordinates",
    "identifier",
    "owned_by",
    "operator",
    "generating_capacity",
    "instance_of",
    "population",
    "website",
    "contains",
    "owns",
    "operates",
    "has_instance"
  ],
  "mirror_cap_hit": [],
  "usage": {
    "tokens": 3996,
    "nodes": 4,
    "edges": 173,
    "reads": 12,
    "ms": 1277
  },
  "truncated": true,
  "truncated_by": "max_tokens",
  "next": null
}