[as of 2026-11-24] Baldy Mesa 2_Silver Peak Hybrid has the identifier eia_plant_id 66885. (current, 0.95, registry) [as of 2026-11-24] Baldy Mesa 2_Silver Peak Hybrid is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Baldy Mesa 2_Silver Peak Hybrid is an instance of solar power station. (current, 0.95, registry) [2025] Baldy Mesa 2_Silver Peak Hybrid is owned by AES Clean Energy from 2025. (current, 0.95, registry) [as of 2026-11-24] Baldy Mesa 2_Silver Peak Hybrid is operated by AES Clean Energy. (current, 0.95, registry) [2025] Baldy Mesa 2_Silver Peak Hybrid had a generating capacity of 75.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Baldy Mesa 2_Silver Peak Hybrid is located in San Bernardino County, California. (current, 0.95, registry) [as of 2026-11-24] Baldy Mesa 2_Silver Peak Hybrid is at 34.609137, -117.453663. (current, 0.95, registry)