# Baldy Mesa 2\_Silver Peak Hybrid

place · `baldy-mesa-2-silver-peak-hybrid` · tier 1 · v1 · updated 2026-11-24

75 MW solar power station in San Bernardino County, California, operated by AES Clean Energy

## Identifiers
- eia_plant_id: 66885

## Facts
### Current
- Baldy Mesa 2\_Silver Peak Hybrid is an instance of power station. (current, 0.95, registry) <https://entiti.tech/c/k_502f91dedd6308ad9010384adafabcfe@1>
- Baldy Mesa 2\_Silver Peak Hybrid is an instance of solar power station. (current, 0.95, registry) <https://entiti.tech/c/k_4325928a54fd10a144dbc13f554d3353@1>
- Baldy Mesa 2\_Silver Peak Hybrid is owned by AES Clean Energy from 2025. (current, 0.95, registry) <https://entiti.tech/c/k_011822d4ae798a30d2e16cf91247ef0f@1>
- Baldy Mesa 2\_Silver Peak Hybrid is operated by AES Clean Energy. (current, 0.95, registry) <https://entiti.tech/c/k_d8b25789be2b1cf765f1722648b8bfdd@1>
- Baldy Mesa 2\_Silver Peak Hybrid had a generating capacity of 75.0 MW on 2025. (current, 0.95, registry) <https://entiti.tech/c/k_ffc31d8349059cd336274af9e355fa66@1>
- Baldy Mesa 2\_Silver Peak Hybrid is located in San Bernardino County, California. (current, 0.95, registry) <https://entiti.tech/c/k_2f12b13ada38fb8424674cc1014d1414@1>
- Baldy Mesa 2\_Silver Peak Hybrid is at 34.609137, -117.453663. (current, 0.95, registry) <https://entiti.tech/c/k_675e980e4c452cc116485d6883b0b082@1>

## Links
- JSON: /e/baldy-mesa-2-silver-peak-hybrid.json · JSON-LD: /e/baldy-mesa-2-silver-peak-hybrid.jsonld · Facts: /e/baldy-mesa-2-silver-peak-hybrid.txt · Feed: /e/baldy-mesa-2-silver-peak-hybrid/feed.xml · Graph: /e/baldy-mesa-2-silver-peak-hybrid/graph
- License: ENTITI-ATTR-1.0 (attribution required; no copying without permission) <https://entiti.tech/license>
