[as of 2026-11-24] Arroyo Solar Energy Storage Hybrid has the identifier eia_plant_id 63172. (current, 0.95, registry) [as of 2026-11-24] Arroyo Solar Energy Storage Hybrid is an instance of power station. (current, 0.95, registry) [as of 2026-11-24] Arroyo Solar Energy Storage Hybrid is an instance of solar power station. (current, 0.95, registry) [2025] Arroyo Solar Energy Storage Hybrid is owned by Arroyo Solar LLC from 2025. (current, 0.95, registry) [as of 2026-11-24] Arroyo Solar Energy Storage Hybrid is operated by Arroyo Solar LLC. (current, 0.95, registry) [2025] Arroyo Solar Energy Storage Hybrid had a generating capacity of 450.0 MW on 2025. (current, 0.95, registry) [as of 2026-11-24] Arroyo Solar Energy Storage Hybrid is located in McKinley County, New Mexico. (current, 0.95, registry) [as of 2026-11-24] Arroyo Solar Energy Storage Hybrid is at 35.970349, -107.563075. (current, 0.95, registry)