[as of 2026-11-24] Arrowrock Hydroelectric Project has the identifier eia_plant_id 56997. [as of 2026-11-24] Arrowrock Hydroelectric Project is an instance of hydroelectric power station. [as of 2026-11-24] Arrowrock Hydroelectric Project is an instance of power station. [2025] Arrowrock Hydroelectric Project is owned by Boise-Kuna Irrigation District from 2025. [as of 2026-11-24] Arrowrock Hydroelectric Project is operated by Boise-Kuna Irrigation District. [2025] Arrowrock Hydroelectric Project had a generating capacity of 15.0 MW on 2025. [as of 2026-11-24] Arrowrock Hydroelectric Project is located in Elmore County, Idaho. [as of 2026-11-24] Arrowrock Hydroelectric Project is at 43.595, -115.9233.